Home » Kilimanjaro Routes » Lemosho Route
The Lemosho Route is the longest of the major routes for climbing Kilimanjaro, and it’s the most expensive as well due to the extra day and the remoteness of the trailhead. The other major distinction between Lemosho and the others is this is the only route where climbers need to spend the first day with an armed ranger due to the abundant wildlife in the area.
The climb itself can take either 7 or 8 days, with 8 days being recommended so climbers have more time to acclimate before the brutal summit day. This route is not nearly as popular as Machame or Maragnu, but it’s a good one to consider because the longer climbing time equals a greater chance of reaching the summit with fewer problems.
The scenery might be the best of all the routes, and in addition you might see wildlife on the first day. The first couple days of Lemosho start well west of the other routes, but starting on day 4 it merges with Machame and becomes the same from there on out. And just as most Machame groups descend on the separate Mweka Route, Lemosho groups typically do as well.
It takes about 3 hours to drive from Moshi to the official trailhead. This is the normal 8-day itinerary, with a note about the 7-day version below:
Day 1: Londorossi Gate to Mti Mkumbwa (2,650 m/8,692 ft)
Hike time: 3hrs
Elevation Change: + 650 M/+2,132
Estimation distance: 10 km
Final Elevation: 2,650 m/8,694 ft
Day 2: Mti Mkubwa (2,650 m/8,692 ft) to Shira One Camp (3,609 m/11,841 ft.)
Hike time: 5 – 6 hrs
Elevation change: + 950 M/+3116
Estimation distance: 12 km
Final Elevation: 3609 m/11,841 ft
Day 3: Shira One Camp (3,609 m/11,841 ft.) to Shira Two Camp (3,849 m/12,628 ft.)
Hike time: 5 - 6 hrs
Elevation change: + 240 M/+787 ft
Elevation distance: 5 km
Final elevation: 3849 m/12,628 ft.
NOTE: From Shira Two Camp on, this route is identical to Machame Route, including the descent on the separate Mweke Route. If you’ve taken Lemosho you’ve done another day at this point, so Day 4 of Lemosho is identical to Day 3 of Machame and so on.
Day 4: Shira Two Camp (3,849 m/12,628 ft.) to Barranco Hut (3,948 m/12,956 ft.)
Hike time: 5 hrs
Elevation change: +100 M/+328 ft
Estimated distance: 6 km
Final elevation: 3948 m/12,956 ft.
Day 5: Barranco Hut (3,900 m/12,800 ft) to Karanga Valley (3,963 m/13,000 ft)
Hike time: 3.5 hrs
Elevation change: +100 m/+328 ft
Estimated distance: 4km/2.5 miles
Final elevation: 3,963 m/13,000 ft
Day 6: Karanga Valley (3,963 m/13,000 ft) to Barafu Hut (4,600 m/15,091 ft)
Hike time: 3.5 hrs
Elevation change: +600 m/+1,968 ft
Estimated distance: 4km/2.5 miles
Final elevation: 4,600 m/15,091 ft
Day 7: Barafu Camp (4,600m/15,091 ft) to the Summit (5,896 m/19,343 ft) and then to Mweka Camp (3,100 m/10,170 ft)
Summit time: 7 hrs
Elevation change: +1,300 m/+4,265 ft
Estimated distance: 5km/3.2 miles
Final elevation: 5,896 m/19,343 ft
Descent time: 5 hrs
Elevation change: -2,800 m/-9,186 ft
Estimated distance: 12km/7.5 miles
Final elevation: 3,100 m, 10,170 ft
Day 8: Mweka Hut (3,100 m/10,170 ft) to Mweka Gate (1,828 m/6,000 ft)
Descent time: 4 hrs
Elevation change: -1,250 m/-4,101 ft
Estimated distance: 10km/6.21
Final elevation: 1,828 m/6,000 ft
The 7-day version of Lemosho
You can do the Lemosho in 7 days instead of 8, and the only difference is days 2 and 3 on the 8-day climb are combined into one 8 to 9 hour climb from Mti Mkubwa to the Shira Two Camp. This extra day is obviously more challenging and it also cuts way down on the climbers’ acclimatization time, which can hurt the chances of reaching the summit with fewer problems.
Mt. Kilimanjaro News